The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.

 

Housing Design and Construction Criteria

Share
  Print

All housing financed through CHFA, including tax credit allocations, must comply with the Multifamily Design, Construction and Sustainability Standards and Guidelines, resulting in housing that’s as energy-efficient, cost-effective and sustainable as possible. These comprehensive standards and guidelines cover a broad range of recommendations, from site location and energy efficiency to the quality and durability of building materials, to ensure we provide safe, comfortable homes for our residents.

CHFA’s Technical Services Team, staffed by architects, evaluates all stages of affordable housing projects for compliance with our standards and guidelines, while also looking to minimize construction costs and mitigate construction risk. Any requirements set by state funding programs and federal tax credit programs are also evaluated.

The Technical Services Team can provide guidance to the owners, consultants and architects of a development before they apply for CHFA financing. The team reviews environmental and geotechnical reports, hard cost estimates and budgets and  architectural drawings and specifications throughout the application process; and CHFA Field Observers observe the construction of a development.

The Technical Services Team reviews more than 100 applications annually for new construction, rehabilitation and capital improvement repairs including replacement reserve requests. 

Along with the Qualified Allocation Plan (QAP), our construction and design standards include ventilation and thermal envelope measures that encourage good air quality and Passive House requirements and other energy efficiency measures  to reduce the demand for heating, cooling and overall energy use.

Our Multifamily Design, Construction and Sustainability Standards and Guidelines go above state code regulations and have been recognized by Global Green USA for producing some of the most energy efficient buildings in the country.

The standards are applicable to every project financed through CHFA, including tax credit allocations, taking cost constraints and available resources into consideration. 

Current Design Standards & Guidelines

2024_Pre-Construction_Advance_Preparation_Guidelines_-_Forms_(2)

2024 Pre-Construction & Advance Preparation Guidelines - Forms
This is a zip file containing all the forms associated with the 2024 Pre-Construction & Advance Preparation Guidelines.

2024_Pre-Construction_Guidelines_REV_4_2024

2024 Pre-Construction Guidelines
These Guidelines detail the subjects for review in a pre-construction meeting, including expectations, rules and requirements of the construction project and the obligations of the parties.

2024_Advance_Preparation_Guidelines

2024 Advance Preparation Guidelines
These Guidelines review the advance and requisition process, expectations, rules, and requirements of the payment process for the construction of the project and the obligations of the parties.

2023_Pre-Construction_Guidelines

2023 Pre-Construction Guidelines
These Guidelines detail the subjects for review in a pre-construction meeting, including expectations, rules and requirements of the construction project and the obligations of the parties.

2022_Pre-Construction_Guidelines

2022 Pre-Construction Guidelines
These Guidelines detail the subjects for review in a pre-construction meeting, including expectations, rules and requirements of the construction project and the obligations of the parties.

2022_Pre-Construction___Advance_Preparation_Guidelines_-_Forms

2022 Pre-Construction & Advance Preparation Guidelines - Forms
This is a zip file containing all the forms associated with the 2022 Pre-Construction & Advance Preparation Guidelines.

2021_Pre-Construction_Guidelines

2021 Pre-Construction Guidelines
These Guidelines detail the subjects for review in a pre-construction meeting, including expectations, rules and requirements of the construction project and the obligations of the parties.

2021_Advance_Preparation_Guidelines

2021 Advance Preparation Guidelines
These Guidelines review the advance and requisition process, expectations, rules, and requirements of the payment process for the construction of the project and the obligations of the parties.

2021_Pre-Construction_and_Advance_Preparation_Guidelines_-_Forms

2021 Pre-Construction & Advance Preparation Guidelines - Forms
This is a zip file containing all the forms associated with the 2021 Pre-Construction & Advance Preparation Guidelines.

2020_Advance_Preparation_Guidelines

2020 Advance Preparation Guidelines
These Guidelines review the advance and requisition process, expectations, rules, and requirements of the payment process for the construction of the project and the obligations of the parties.

2019_Pre-Construction_Guidelines

2019 Pre-Construction Guidelines
These Guidelines detail the subjects for review in a pre-construction meeting, including expectations, rules and requirements of the construction project and the obligations of the parties.

2019_Pre-Construction_and_Advance_Preparation_Guidelines_-_Forms

2019 Pre-Construction & Advance Preparation Guidelines - Forms
This is a zip file containing all the forms associated with the 2019 Pre-Construction & Advance Preparation Guidelines.

General Info & Forms

Archived

2019_Advance_Preparation_Guidelines

2019 Advance Preparation Guidelines
These Guidelines review the advance and requisition process, expectations, rules, and requirements of the payment process for the construction of the project and the obligations of the parties.

2018_Advance_Preparation_Guidelines

2018 Advance Preparation Guidelines
These Guidelines review the advance and requisition process, expectations, rules, and requirements of the payment process for the construction of the project and the obligations of the parties.

2018_Pre-Construction_Guidelines

2018 Pre-Construction Guidelines
These Guidelines detail the subjects for review in a pre-construction meeting, including expectations, rules and requirements of the construction project and the obligations of the parties.

2018_Pre-Construction_and_Advance_Preparation_Guidelines_-_Forms

2018 Pre-Construction & Advance Preparation Guidelines - forms
This is a zip file containing all the forms associated with the 2018 Pre-Construction & Advance Preparation Guidelines.

2017ConstnGuidelines-TSAM-CIG_111416

2017 Construction Guidelines: Technical Services/Asset Management (TSAM) and Capital Improvement Guide (CIG)
This document includes issues and conditions when an owner is planning various capital improvement/replacement/repair projects financed through CHFA.

2017_Pre-Construction_and_Advance_Preparation_Guidelines_-_Forms

2017 Pre-Construction & Advance Preparation Guideline - forms
This is a zip file containing all the forms associated with the 2017 Pre-Construction & Advance Preparation Guideline.

 
 
© 2024 Connecticut Housing Finance Authority. All Rights Reserved
Close