Site Map | Contact Us  |  Search:  

 go
   
Email Print Font - Font +

Tools, Calculators and Look-ups

Technical Services Forms, Standards and Guidelines  

Follow the link below to download documents related to CHFA's Multifamily Technical ServiceCurrent Technical Services Documents

 

Current Multifamily Standards and Guidelines

Related DocumentsFound: 8  matches.  
FileSizeType
2017 Construction Guidelines: Construction Costs
Outlines CHFA's Construction Cost Guidelines. Effective January 1, 2017.
262Kpdf

2017 Construction Guidelines: Energy Conservation
Outlines CHFA's energy efficiency process and energy conservation plan. Effective January 1, 2017.
650Kpdf

2017 Construction Guidelines: Environmental & Hazardous Materials
Outlines CHFA's environmental and/or hazardous materials guidelines. Effective January 1, 2017.
247Kpdf

2017 Construction Guidelines: Project Planning & Technical Services Review
Outlines the Technical Services review process. These guidelines are effective September 8, 2017.
375Kpdf

2017 Construction Guidelines: Technical Services/Asset Management (TSAM) and Capital Improvement Guide (CIG)
This document includes issues and conditions when an owner is planning various capital improvement/replacement/repair projects financed through CHFA. Effective January 1, 2017.
435Kpdf

2017 Multifamily Design, Construction and Sustainability Standards-CHFA
The Standards set forth design and construction guidelines for multifamily housing financed or administered by CHFA/DOH through 2017. These standards are effective January 1, 2017.
714Kpdf

2017 Pre-Construction & Advance Preparation Guidelines
These Guidelines detail the subjects for review in a pre-construction meeting, including the advance and requisition process, expectations, rules and requirements of the construction project and the obligations of the parties.
405Kpdf

2017 Pre-Construction & Advance Preparation Guidelines - forms
This is a zip file containing all the forms associated with the 2017 Pre-Construction & Advance Preparation Guidelines.
1757Kzip
FileSizeType
Found: 8  matches.  

 

Archived Multifamily Standards and Guidelines

Related DocumentsFound: 23  matches.  
FileSizeType
2013 - Standards of Design and Construction - Update to Energy Star Multifamily High Rise Program 02/25/2013
On February 25, 2013, EPA released Version 1.2 of the Performance Path Calculator and Version 1.4 of the Testing and Verification Worksheets. This is a summary of the updates.
18Kpdf

2013 - Standards of Design and Construction (01-01-13 to 07-31-13)
The Standards of Design and Construction reflect national and regional residential "Green" rating criteria, augments current applicable Building Code requirements, and sets forth design and construction standards and guidelines for multifamily housing financed or administered by CHFA through 2013. These standards are effective January 1, 2013 through July 31, 2013.
1971Kpdf

2013 - Multifamily Design, Construction and Sustainability Standards (08-01-13 to 12-31-13)
The Department of Housing (DOH) has adopted these standards. These Standards reflect national and regional residential "Green" rating criteria augmenting current applicable Building Code requirements, and set forth design and construction standards and guidelines for multifamily housing financed or administered developments by CHFA/DOH through 2013. These Standards are effective August 1, 2013 through December 31, 2013.
542Kpdf

2014 Construction Guidelines - Construction Cost
Construction Cost Guidelines to allow assessment of cost effectiveness of proposed development based upon project building type & proposed work to be performed. These guidelines are effective January 1, 2014 through December 31, 2014.
217Kpdf

2014 Construction Guidelines - Energy Conservation
Outlines CHFA's energy efficiency process and energy conservation plan. These guidelines are effective January 1, 2014 through December 31, 2014.
861Kpdf

2014 Construction Guidelines - Environmental & Hazardous Materials Review
These are guidelines governing the review and documentation of environmental and/or hazardous materials in new construction and/or the rehabilitation of existing buildings. These guidelines are effective January 1, 2014 through December 31, 2014.
138Kpdf

2014 Construction Guidelines - Technical Services/Asset Management (TSAM) Capital Improvement Guide (CIG)
This document includes suggested related issues and conditions to be examined when an owner is planning various capital improvement/replacement/repair projects financed through CHFA. These guidelines are effective January 1, 2014 through December 31, 2014.
480Kpdf

2014 Construction Guidelines - Technical Services/Asset Management (TSAM) Capital Improvement Project Review
Outlines the Technical Services/Asset Management process for planning capital improvements, repairs and replacements. These guidelines are effective January 1, 2014 through December 31, 2014.
219Kpdf

2014 Construction Guidelines: Project Planning and Technical Services Review
Outlines the Technical Services review process. These guidelines are effective January 1, 2014 through December 31, 2014.
412Kpdf

2014 Multifamily Design, Construction and Sustainability Standards - CHFA
The Department of Housing (DOH) has adopted these standards. These Standards reflect national and regional residential "Green" rating criteria augmenting current applicable Building Code requirements, and set forth design and construction standards and guidelines for multifamily housing financed or administered developments by CHFA/DOH through 2013. These Standards are effective January 1, 2014 to December 31, 2014.
608Kpdf

2015 Construction Guidelines: Construction Costs
Construction Cost Guidelines to allow assessment of cost effectiveness of proposed development based upon project building type & proposed work to be performed. These guidelines are effective January 1, 2015.
259Kpdf

2015 Construction Guidelines: Energy Conservation
Outlines CHFA's energy efficiency process and energy conservation plan. These guidelines are effective January 1, 2015.
937Kpdf

2015 Construction Guidelines: Environmental & Hazardous Materials Review
These are guidelines governing the review and documentation of environmental and/or hazardous materials in new construction and/or the rehabilitation of existing buildings. These guidelines are effective January 1, 2015.
179Kpdf

2015 Construction Guidelines: Project Planning & Technical Services Review
Outlines the Technical Services review process. These guidelines are effective January 1, 2015.
570Kpdf

2015 Construction Guidelines: Technical Services/Asset Management (TSAM) Capital Improvement Guide (CIG)
This document includes suggested related issues and conditions to be examined when an owner is planning various capital improvement/replacement/repair projects financed through CHFA. These guidelines are effective January 1, 2015.
503Kpdf

2015 Construction Guidelines: Technical Services/Asset Management (TSAM) Capital Improvement Project Review
Outlines the Technical Services/Asset Management process for planning capital improvements, repairs and replacements. These guidelines are effective January 1, 2015.
235Kpdf

2015 Multifamily Design, Construction and Sustainability Standards-CHFA
The Department of Housing (DOH) has adopted these standards. These Standards reflect national and regional residential "Green" rating criteria augmenting current applicable Building Code requirements, and set forth design and construction standards and guidelines for multifamily housing financed or administered developments by CHFA/DOH through 2015. These Standards are effective January 1, 2015.
634Kpdf

2016 Construction Guidelines: Construction Costs
Outlines CHFA's Construction Cost Guidelines. Effective July 1, 2016.
261Kpdf

2016 Construction Guidelines: Energy Conservation
Outlines CHFA's energy efficiency process and energy conservation plan. Effective June 1, 2016.
688Kpdf

2016 Construction Guidelines: Environmental & Hazardous Materials
Outlines CHFA's environmental and/or hazardous materials guidelines. Effective January 1, 2016.
227Kpdf

2016 Construction Guidelines: Project Planning & Technical Services Review
Outlines the Technical Services review process. These guidelines are effective July 1, 2016.
372Kpdf

2016 Construction Guidelines: Technical Services/Asset Management (TSAM) and Capital Improvement Guide (CIG)
This document includes issues and conditions when an owner is planning various capital improvement/replacement/repair projects financed through CHFA. Effective January 1, 2016.
435Kpdf

2016 Multifamily Design, Construction and Sustainability Standards-CHFA
The Standards set forth design and construction guidelines for multifamily housing financed or administered by CHFA/DOH through 2016. These standards are effective January 1, 2016.
708Kpdf
FileSizeType
Found: 23  matches.  

 

 

Documents and Forms

Related DocumentsFound: 11  matches.  
FileSizeType
Assurance of Utilities
This form is used to verify that all applicable utilities serving the site are adequate and operational.
47Kxlsx

Capital Needs Assessment Schedule
This spreadsheet is used by an Owner for determining life-cycle replacement budgeting for capital improvements, in conjunction with a Capital Needs Assessment (CNA) report. Updated 12-07-2012.
1236Kxls

Certificate of General Contractor form
This form is to be submitted by the General Contractor when requesting payment from CHFA if the General Contractor has outstanding obligations to others.
176Kpdf

CHFA Multifamily Insurance Requirements
This document outlines CHFA's insurance requirements for multifamily properties.
49Kpdf

Contractor's Multiple Building - Construction Cost Breakdown
This form tracks the value and amount of completed trade items by building for multiple buildng developments under construction.
550Kxls

Mortgagor's Advance Application
This form is used as a mortgagor's request to advance funds during construction.
1104Kxls

Notification of Intent to Commence Construction
A form the Mortgagor needs to complete for commencing construction before Initial Closing. A hard copy of the attached form shall be submitted to the Technical Services Department.
208Kdoc

Project Square Footage Information Table - (Excel)
This table lists information about a project including a breakdown of building use and square footage; unit type distribution and net square footage by unit type.
91Kxls

Supplemental Cost Certification
This Supplemental Cost Certification shall serve as verification that all outstanding payables at the time of Final Closing have been paid by the Mortgagor and/or the Contractor (as applicable) and that no further amounts are due and owing to any creditors regarding the construction of the Development.
69Kdoc

Utility Company Incentives-Energize CT Certified HERS Raters
This Energize CT reference document provides contact information for Certified HERS Raters providing energy conservation design, testing and verifications services in the United Illuminating, Connecticut Natural Gas, Southern Connecticut Gas and/or Eversource service areas. The services provided by Certified HERS Raters are necessary for ENERGY STAR Certification, and qualifying for financial incentives under the Energize CT Residential New Construction (RNC) Program.
134Kpdf

VLI - Section 3 Summary Report - Economic Opportunities for Low and Very Low-Income Persons
Submit one (1) copy of this report to the HUD Headquarters Office of Fair Housing and Equal Opportunity, at the same time the performance report is submitted to the program office. The Section 3 report is submitted by January 10. Include only contracts executed during the period specified in item 8. PHA/s/IHAs are to report all contracts/subcontracts.
158Krtf
FileSizeType
Found: 11  matches.